Tuesday , March 2 2021

Fire by Viktor Chernomyrdin is local



Broken-burning on Viktor Yanukovych's Chernobyl underground in construction has ended. Able to stop a 300-mile-meter stop – three of five pieces of & nbsp; the largest diesel-electric icebreaker of the world.

Firebolt number changed from third to 1 to, reports Tass The fire spread over the second, third and fourth decides, which is at the pier of the road of Fontanka Street.

Two people liked the fire. Dochters have broken down that there is no threat to the life of victims of the fire.

Factory Buildings of Admiralite Tasks Do not Fail. According to performance data, the cause of the fire was a short separation. But all the versions that can cause a fire will be checked.

The largest Russian diesel-electric icebreaker "Viktor Chernomyrdin" came out as a marine construction. First, it was the plan to move it to the client in 2015, but he was only half a year later. To end the ice breaker by telling a December 2018, Deputy Transport Minister Viktor Olersky. The fire, however, did not replace this resistance.


Source link